Custom Search
 
  
 
TM 55-1905-221-14-3
6-10.
RAMP, RAMP CABLES, SHEAVES, LATCH MECHANISM AND SEAL.
This task covers:
a. Removal
d. Inspection
g. Installation
b. Disassembly
e. Repair/Replace
c.  Cleaning
f.  Assembly
INITIAL SETUP
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition
Condition Description
Paragraph
NONE
NONE
Tools
General Mechanic's Tool Kit
Hoist
Sledge hammer
Material/Parts
Special Environmental Conditions
Cleaning Solvent
NONE
Fed. Spec. P-D-680
Clean Cloths
Grease
Personnel Required
General Safety Instructions
MOS 61C10, 44B
Observe WARNINGS in procedure.
6-87


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business