TM 55-1905-221-14-3
6-10.
RAMP RAMP CABLES, SHEAVES, LATCH MECHANISM AND SEAL
(Continued).
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
11. Load Binders
Welding must be performed by a qualified welder only
in accordance with standard welding procedures.
a. Position load binders
(2) in place on bow.
b. Weld (1) to bow (3).
c.
Grind weld smooth.
6-97