Custom Search
 
  
 
TM 55-1905-221-14-3
6-10.
RAMP CABLES, SHEAVES, LATCH MECHANISM AND SEAL
(Continued).
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION (Cont)
c.
Secure pin sheave (5)
with castellated nut
(4).
d. Align holes in nut (4)
with holes in pin (5)
then secure with cotter
pin (3).
e. Reconnect lubricating
hose (2) to sheave.
f.
Install access plate
(1).
g. Install remaining
sheaves in a similar
manner.
6-100


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business