Tweet |
Custom Search
|
|
|
||
TM 55-1905-221-14-3
6-16.
PROPELLER, PROPELLER SHAFT, AND STUFFING BOX (Continued).
LOCATION/ITEM
ACTION
REMARKS
ALIGNMENT (Cont)
(3) When it is suspected
that the shaft is out
of alignment, it
should be checked
by slacking the
coupling bolts at a
coupling near the
suspected area on
the shaft. Feelers
are inserted between
the coupling flanges,
and if there is a
greater distance
between the faces
at one part of the
coupling than at
another, the shafts
are out of alignment
at these places.
INSTALLATION OUT OF WATER
23. Propeller
a. Coat propeller shaft (5)
with a light coating of
graphite and grease on
shaft taper.
b. Place propeller (4) over
end of shaft (5).
c.
Secure with jamnut (3)
and propeller nut
(2).
d. Align holes in shaft (5)
with holes in nut (2)
and install cotter pin
(1).
6-194
|
||