Custom Search
 
  
 
TM 55-1905-221-14-3
6-22.
POWER UNIT - MULTIPLE ENGINE REMOVAL - AND RUN-IN INSTRUCTIONS
(Continued).
LOCATION / ITEM
ACTION
REMARKS
REMOVAL (Cont)
Pipes
Wear breathing and face protection devices when handling and removing asbestos
coverings.
a. Remove asbestos pipe
straps and pipe
coverings as needed.
b. Remove nuts (74),
lockwashers (75), and
screws (76).
c.
Remove nuts (77),
lockwashers (78), and
screws (79).
d. Remove flexible pipe
(80), and gaskets
(81).
e. Remove nuts (82),
lockwashers (83), and
screws (84).
f.
Remove gasket (85).
NOTE
The following step requires 3 persons.
g. Remove nut (86),
lockwasher (87),
screw (88), and
exhaust pipe assembly
(89).
h. Perform the previous
steps a. through g.
on the other engine.
6-257


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business