Custom Search
 
  
 
TM 55-1905-221-14-3
6-22.
POWER UNIT - MULTIPLE ENGINE REMOVAL - AND RUN-IN INSTRUCTIONS
(Continued).
LOCATION/ITEM
ACTION
REMARKS
INSTALLATION
27. Propulsion
a. Attach chains or cables to
Unit
lifting brackets (106 and
107).
During propulsion unit installation operation all persons should keep clear of engine and
hoisting equipment.
b. Using appropriate lifting
equipment carefully lower the
propulsion unit until it is
approximately 6 inches from
the foundation.
6-287


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business