TM 55-1905-222-14
Section III. OPERATION UNDER USUAL CONDITIONS
2-3
PRE-OPERATING PROCEDURES.
2-3.1  Initial Engine Start. The precharge pressure of the accumulators is the pressure of the nitrogen gas with which
the accumulators are initially charged. This pressure must be checked before the system pressure is raised for the initial
engine start. To check the precharge pressure, proceed as follows:
a.
Open the accumulator blowdown valve (1) on the ramp/starting system hydraulic tank.
b.
Open accumulator shut-off valve (2) and allow pressure gauge (3) to return to zero.
Change 6
2-37


 