Hoisting Anchor.
a.
To hoist anchor, take-in anchor line while the vessel is moving slowly forward to the anchor location.
b.
When the anchor line is vertical, stop the vessel and hoist the anchor aboard the vessel.
c.
Disassemble the LCM-8 ground tackle and stow the anchor, anchor chain and line as directed by the
coxswain.
2-4.3  Operation of Ramp System. The ramp system may be operated with only one ramp pump in operation.
However, if maximum ramp hoisting rate is required, both ramp pumps must be in operation.
2-4.3.1
Lowering Ramp. Normal ramp lowering is accomplished with the installed hydraulic ramp system, using
the following procedure:
WARNING
Do not lower the ramp when the LCM-8 is underway. The ramp should be operated
only after the LCM-8 has been beached or docked. Failure to comply may sink the
vessel and endanger personnel.
a.
Ensure that the lower hand pump shut-off valve (1) is closed.
b.
Ensure that the upper hand pump shut-off valve (2) is opened.
c.
Ensure that the hand pump by-pass valve (3) is opened.