Custom Search
 
  
 
TM 55-1905-222-14
d.
Pump oil from primary and secondary stage separator to holding tank (refer to TM 55-2090-201-14&P).
c.
Pump oil from holding tank to another holding tank ashore.
(1)  Attach one end of hose to coupling at V-3 and the other end to a used oil container at a shore
installation.
(2)  Open valves V-3 and V-6.
(3)  Close valves V-1, V-2, V-4, V-5, V-7, and V-10.
(4)  Turn on OWS pump at control panel (refer to TM 55-2090-201-14&P).
(5)  Turn off OWS pump when you are done and close V-3 and V-6.
Change 6
2-59


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business