Tweet |
Custom Search
|
|
|
||
TM 55-1905-222-14
MAINTENANCE OF ENGINE/TRANSMISSION INSTRUMENTS
5-10 REPLACE ENGINE/TRANSMISSION INSTRUMENTS.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools:
Equipment Conditions:
Tool Kit, Mechanic's, Rail
Engines shut down All power off
and Marine
Remove all oil pressure from lines
to gauges.
General Safety Instructions:
Energized electrical equipment is
dangerous. Never work on energized
equipment unless authorized to do so
by a responsible authority.
NOTE
Removal and installation is same for hydraulic gauges, rudder, angle
indicator and ammeter.
REMOVE ENGINE/TRANSMISSION
INSTRUMENTS
a.
Remove screws (1), clear cover (2) and gasket (3).
b.
Remove screws (4) and lift instrument panel (5) to
gain access to instruments.
c.
Disconnect tube or wires (6) by removing flare nut
(7).
d.
Remove male connector (8) (if applicable) and
replace gauge (9).
5-26
|
||