TM 55-1905-222-14
MAINTENANCE OF RAMP HOIST HAND PUMP
5-20
REPLACE RAMP HOIST HAND PUMP.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools:
Equipment Conditions:
Tool Kit, Mechanic's, Rail
Engine shut down.
and Marine
Ramp hydraulic system drained
of oil at the hand pump.
General Safety Instructions:
Ensure that hydraulic pressure
In the system is relieved before
working on system.
REMOVAL
WARNING
The oil pressure in the system must be released prior to servicing
the pump or other parts to prevent possible injury to personnel or
damage to equipment.
REMOVE HAND PUMP.
a.
Clean connections.
b.
Disconnect union (1). Cap ends.
c.
Remove line and fitting (2).
d.
Remove mounting bolts (3).
e.
Remove hydraulic
tank
and
hand
pump
assembly (4).
5-46