Custom Search
 
  
 
TM 55-1905-223-10
(c) Open CROSS CONNECT (4) valve by fully turning in a counter clockwise direction.
(d) Operate HYDRAULIC HAND PUMP (3) to override the hydraulic failsafe brake. Approximate
20 strokes will release brake.
(2) Lower Bow Ramp.
WARNING
Before operating-bow ramp winch, ensure personnel and foreign objects are clear
of wire rope drum, wire rope, bow ramp, and related components. Moving winch
and ramp parts can cause serious injury or death.
Clear all personnel and equipment from bow ramp and bow ramp path of travel.
Moving ramp can cause serious personal injury.
NOTE
Sound powered telephones must be used for coordination of actions on Forecastle
Deck and Boatswains Storage.
(a) Direct one crew member to starboard forecastle deck and another crew member to port
forecastle deck.
(b) Turn EMERGENCY HANDCRANK (2) counterclockwise to tighten rig and take load off Bow
Ramp Locking Assembly.
(c) Direct crew members on forecastle decks to turn RATCHET HANDLE (3, FIGURE 2-255, of
locking assembly to release LOCKING CLAMP (2).
(d) Direct crew members on forecastle decks to remove LOCKOUT PIN (5) and pull CHAIN
STOPPER HANDLE (4) aft to release port and starboard CHAIN STOPPER (1) and prevent
chain stopper from engaging chain during operation.
(e) Turn EMERGENCY HANDCRANK (2, FIGURE 2-254) clockwise to lower ramp.
NOTE
Approximately 1450 turns are required to completely haul-in or payout 25 feet of
cable.
Change 1 2-666


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business