Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-10
- Start all available powered ventilation within the protected space
- Washdown complete interior and all equipment, within the protected
space, with fresh water.
(4) Paint Locker Re-Entry Procedures. Upon issuance of re-entry authorization by the person
in charge at the scene and authorization to ventilate, the following actions shall be taken:
- Open paint locker supply and exhaust vent openings
- Reset pressure switch plunger.
NOTE
FM-200 pressure switches must be manually reset by pushing
down on the plunger, on top of pressure switch. Plunger must
be returned to "set" position to reactivate all systems shutdown
by pressure switch.
- Open paint locker door and ventilate space using portable, powered ventilation
- Washdown complete interior and all equipment, within the protected space,
with fresh water
(5) A/C and Emergency Generator Room Re-entry Procedures. Upon issuance of re-entry
authorization by the person in charge at the scene and authorization to ventilate, the
following actions shall be taken:
- Remove the following ventilation covers:
A/C and Emergency Generator Room Supply Fan
A/C and Emergency Generator Room Natural Air Intake
Air Conditioning Vent Plenum
Emergency Generator Exhaust
- Reset plunger on pressure switches
NOTE
FM-200 pressure switches must be manually reset by pushing
down on the plunger, on top of pressure switch. Plunger must
be returned to "set" position to reactivate all systems shut down
by pressure switch.
- Start all available powered ventilation within the protected space.
- Washdown complete interior and all equipment, within the protected
space, with fresh water.
k.
Bilge Water
(1) Classification. Bilge water which has been exposed to FM-200 fire extinguishing agent
in extinguishing a fire, shall be classified and treated as hazardous waste.
(2) Disposal of Hazardous Waste. Hazardous waste shall be disposed of in accordance with
local, state and federal requirements and regulations for hazardous waste.
2-740
Change 10
|
||