10.  DOCK AND SEA TRIALS: Dock and Sea Trials are accomplished upon completion of all OCCM
contract specification work requirements.
a.
The objective of the Dock and Sea trials is to insure that all requirements of the contract work
specification have been satisfactorily accomplished and that the vessel is in all respects, safe, fully seaworthy
and mission capable.
b.
Dock and Sea Trials are performed by the contract shipyard in accordance with the repair
specification requirements. The assigned NMP ship surveyor witnesses all dock and sea trials and attests to
the satisfactory completion of same. Unit personnel will be present In Accordance With AR 56-9, however, it is
in the best interest that the chief engineer and vessel master are present when not specifically required by
regulation to observe the trials and ensure the vessel is acceptable. Contractor personnel man the vessel and
record all data required by the specification and submit a final report.
c.
General and specific requirements for dock and sea trials are contained in Section 7 of the
applicable Appendix.  The surveyor will also insure all specification items of OCCM contract have been
accomplished.
d.
Sea Trials as used herein are underway trials which may be conducted on any body of water
where there is sufficient water depth and maneuvering space to conduct the specified trials.
VESSEL CHARACTERISTICS:
Construction:
Steel
Length:
174 Feet
Beam, Molded:
42 Feet
Depth Molded:
11.5 Feet
Displacement (approximate):
Light
575 Long Tons (LT)
Loaded:
1087 Long Tons (LT)
Draft, Mean
Light:
8 Feet
Loaded:
8 Feet, 10 inches
2500 hp
Change 8 G-8


 