Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-1
(3) Position thermostat gasket (11) and thermostat housing (17) to thermostat housing support
(18).
(4) Install six lockwashers (14) and hexagon head capscrews (15). Tighten capscrews to 30-35
ft-lb (41-47 N m) alternately and evenly.
g.
Refill coolant system (TM 55-1905-223-10).
h.
Start engine (TM 55-1905-223-10). Check for leaks.
i.
Shut down engine after it reaches operating temperature. Check coolant leel. Add coolant as
v
necessary.
FIGURE 2-14. Thermostat Seal Replacement.
2-59
|
||