Custom Search
 
  
 
TM 55-1905-223-24-1
REPLACEMENT
a.
Install pressure switch (8).
b.
Install liquid level gage rod (6).
c.
Install filler opening connection (2).
d.
Install filler opening cap (1).
e.
Position expansion tank (9) with boltholes aligned.
f.
Install six hexagon nuts (5), lockwashers (4) and machine bolts (3).Secure until tight.
g.
Install piping connections.
h.
Install water line (7).
i.
Refill coolant and start engine (TM 55-1905-223-10).
j.
Check for leaks. Repair as required.
2-145


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business