TM 55-1905-223-24-10
Section II. MAINTENANCE ALLOCATION CHART
FOR
BOW RAMP ASSEMBLY
(3)
MAINTENANCE LEVEL
(5)
(1)
(6)
(2)
UNIT
I DS
GS
DEPOT
COMPONENT
TOOLS
MAINTENANCE
GROUP
ASSEMBLY
AND
FUNCTION
REMARKS
NUMBER
C
O
F
H
D
EQUIP
10
BOW RAMP ASSEMBLY
INSPECT
4.0
1
SERVICE
4.0
1
ALIGN
2.0
3
A
ADJUST
1.0
1
REPLACE
48.0
1-6
A, B, C,
D, E, F,
G,H,I
REPAIR
1.0
4.0
75.0
1-6
A, B, C,
D, E, F,
G,H,I
OVERHAUL
*
K
1001
HYDRAULIC POWER
INSPECT
2.0
1
PACK ASSEMBLY
SERVICE
4.0
1
REPLACE
7.0
1-5
REPAIR
1.0
2.0
42.0
1-6
B, D, F
100101
MOTOR, ELECTRIC
INSPECT
1.0
1
SERVICE
1.0
1
ALIGN
2.0
3
A
REPLACE
2.0
1,3
A
REPAIR
8.0
1,2, 3
B
100102
PISTON PUMP
INSPECT
1.0
1
ASSEMBLY
SERVICE
1.0
1
ALIGN
1.0
1,3
A
REPLACE
2.0
1
A, F
REPAIR
12.0
1,3
B, F
100103
CONTROL VALVE,
INSPECT
0.5
1
DIRECTIONAL
REPLACE
2.0
1-3
F
REPAIR
12.0
1,4
B
100104 VALVE, MODULAR
INSPECT
1.0
1
RELIEF/ CROSSPORT
RELIEF
REPLACE
1.0
1,2
REPAIR
3.0
1,2
Change 3
B-4
|
|