Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-11
2-18. Repair Equipment Routing Cable Assembly.
This task covers:
a. Inspection, b. Removal,
c. Repair,
d. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Electrical power OFF and tagged at the
primary breaker to the sanitation unit.
Tool kit, electrician's,
Materials/Parts
Electrical tape, Item 11, Appendix C
Warning tags, Item 10, Appendix C
Gasket P/N 2502271
Cable, maritime P/N 3599004-003
Cable, maritime P/N 3599004-002
Equipment routing cable assembly
P/N 3800006
NOTE
The equipment routing cables assembly includes six individual maritime electrical
cables with their attaching hardware. These cables are for routing the four pump
motors, chlorination solenoid, and backwash solenoid to the control module
assembly. Refer to paragraph 2-17 and FIGURE 2-14 for disconnecting the
individual cables from the control module assembly.
INSPECTION
WARNING
SHOCK HAZARD. Make sure electrical power is OFF to the sanitary unit.
2-55
|
||