Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-12
2-7. Initial Setup Procedure. Includes operational checks and inspections that are not performed for a
routine startup. Direct support maintenance personnel will perform initial setup in accordance with the
operator's manual TM 55-1905-223-10.
2-8.
Normal Startup. Refer to operator's manual TM 55-1905-223-10.
2-9.
Shutdown Procedure (Usual or Unusual). Refer to operator's manual TM 55-1905-223-10.
Section III. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
2-10. Explanation of PMCS Table. PMCS is designed to keep the equipment in good working condition.
This is accomplished by performing certain tests, inspections, and services. Table 2-1 lists items to be
serviced and the procedures needed to accomplish the PMCS. The "Interval" column tells you when to perform
a check or service. If needed, PMCS may be performed more frequently than the indicated interval. The
"Procedures" column tells you how to perform the required checks and services. If your equipment does not
perform as required, see Table 2-2, Troubleshooting. Report any malfunctions or failures on DA Form 2404. In
the Item Number column on DA Form 2404, record the appropriate Item Number from the PMCS table.
2-3
|
||