Custom Search
 
  
 
TM 55-1905-223-24-15
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
2-21.  Preparation for Storage or Shipment.  Administrative storage of equipment issued to and used by Army
activities will have preventive maintenance performed in accordance with the Preventive Maintenance Checks and
Services (PMCS) charts before storing. When removing the equipment from administrative storage, the PMCS should
be performed to assure operational readiness. Perform the following actions to prepare the windlass for storage:
a. Perform all PMCS procedures, Table 2-1.
b. Place the chain stoppers (Devil's Claw) in the chain (paragraph 2-13).
c. Remove electrical power from the hydraulic power pack and tag "Out of Service - Do Not Operate."
d. Drain hydraulic fluid from the reservoir (paragraph 2-13).
e. Remove any loads on the wildcats, such as nylon line, and tighten the windlass hand brake (paragraph 2-13).
2-34


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business