Custom Search
 
  
 
TM 55-1905-223-24-16
e. Connect Wire Rope to Stern Anchor. Connect wire rope to stern anchor, using these steps:
(1)
Press START pushbutton switch on stern control box to start ac motor in hydraulic power pack assembly.
(2)
Operate winch in PAYOUT mode.
(3)
Unreel wire rope from spool.
(4)
Thread wire rope through rollers of levelwind and anchor fairlead.
(5)
Connect eye of wire rope to anchor assembly using supplied shackle, swivel, and detachable chain link.
(6)
Operate winch in HAULBACK mode to take up slack in wire rope.
(7)
Connect turnbuckle and adjust for constant tension,
(8)
Turn off ac motor in hydraulic power pack assembly.
f.
Operational Test of Stern Anchor Winch Subsystem. Test operation of stern anchor winch subsystem as follows:
(1)
Start ac motor in hydraulic power pack assembly.
(2)
Loosen turnbuckle.
(3)
Detach shackle from anchor and disengage turnbuckle from anchor.
(4)
Operate winch in PAYOUT mode and observe that anchor is lowered properly.
(5)
Operate winch in HAULBACK mode.
(6)
Observe that anchor is raised to storage position.
(7)
Manually operate dog lever to activate locking device for spool.
(8)
Install shackle to anchor and engage turnbuckle to anchor.
(9)
Adjust turnbuckle for constant tension and turn off ac motor in hydraulic power pack assembly.
2-7.
Initial Setup Procedure.  Includes operational checks and inspections that are not performed for a routine
startup. Direct support maintenance personnel will perform initial setup in accordance with the operator's manual, TM 55-
1905-223-10.
2-8.
Normal Startup. Refer to the operator's manual, TM 55-1905-223-10.
2-9.
Shutdown Procedure (Usual or Unusual). Refer to the operator's manual, TM 55-1905-223-10.
2-6


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business