Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-16
(6)
Pull electrical wiring through opening in wiring box.
(7)
Secure conduit nut (9) to wiring box.
(8)
From wiring box (10), connect electrical wire connections to electrical solenoid (11) as tagged.
(9)
Position preformed packing (8) and symbol plate (7) on wiring box (10) and aligned over screw holes.
(10) Install machine screws (6) and secure symbol plate to wiring box.
b.Install Hydraulic Pipe Fittings.
NOTE
Remove protective caps/plugs from hydraulic lines prior to installation.
(1)
Connect pipe nipple and fitting (5, 4) to directional control valve (12).
(2)
Connect fitting (2) to directional control valve (12).
(3)
Connect couplers (1) and (3) to fittings (2) and (4).
(4)
Connect pipe fittings to port A (15) and port B (14) on directional control valve (12).
c. Restore equipment to operational condition. (Reference TM 55-1905-223-10.)
2-48
|
||