Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-16
(4)
At winch assembly, disengage locking device from spool flange by operating dog lever (7).
(5)
Engage clutch lever (6) to engage spool (4).
(6)
Slowly unscrew brake wheel (5) counterclockwise.
(7)
On stern control box, move control switch to HAULBACK mode and haul single end wire rope assembly (1) up
and through fairlead with roller swivel (2), levelwind carriage (3) and travel completed at spool (4).
(8)
Attach end of wire rope assembly (1) to empty reel.
(9)
On stern control box, move control switch to PAYOUT mode to transfer wire rope assembly from spool to
empty reel.
(10) Maintain tension on wire rope at empty reel.
NOTE
Transfer of wire rope assembly is from top of spool to top of empty reel.
(11) On stern control box, move control switch to neutral when wire rope transfer completed.
(12) Release clamp provided in flange from end of wire rope on spool and secure remaining wire to reel.
(13) Use lifting device and sling to remove reel containing wire rope to a clear area.
f.
Fairlead With Roller Swivel. (FIGURE 4-1)
(1)
Attach lifting sling to fairlead with roller swivel (21).
(2)
Remove ten self-locking hexagon nuts (23) and machine bolts (24) from mounting pad (22).
(3)
Lift fairlead with roller swivel to a secure area.
g.
CAUTION
During replace/repair of hydraulic systems, all openings should be capped/plugged
to prevent foreign matter or contamination from entering the system. Mark any
shims installed between the winch and deck for reinstallation.
(1)
Disconnect hydraulic pipe connectors (2, 6, and 7) from hydraulic lines 3, 4, and 5) on deck plate at base of
hydraulic pump assembly (1).
4-8
|
||