Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-16
(2)
Attach four legged sling to lifting points (FIGURE 4-4).
CAUTION
Keep four legged sling clear of all winch components to prevent damage when lifting.
(3)
Remove fourteen 1-1/4 in. mounting machine bolts and self-locking hexagon nuts (3, 4, FIGURE 4-1)
securing stern anchor winch to mounting platform.
WARNING
Improper lifting/hoisting heavy/bulky items presents hazards to equipment and
personnel.
Never hoist equipment or cargo over personnel. Ensure proper supervision and
lifting techniques are employed at all times.
Ensure working areas are cleared of all personnel except those involved with
lifting/hoisting operations.
(4)
Lift winch and position in a clear area.
(5)
Remove four legged sling.
Repair consists of replacing: shackle (6), detachable chain link (12), turn-buckle (7), fluked marine anchor (10), swivel and
link assembly (13), shackle (14), single leg wire rope assembly (16), machine bolts (24), and stern anchor winch assembly
(1).
REPLACEMENT
a. Stern Anchor Winch.
(1)
Attach four legged sling to lifting points (FIGURE 4-4).
CAUTION
Keep four legged sling clear of all winch components to prevent damage when
lifting.
4-10
|
||