Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-16
b. Levelwind Bushings. (FIGURE 4-25)
(1)
Position levelwind carriage (1) on a flat surface.
(2)
Install two bushings (3) into lower section of levelwind carriage.
(3)
Install two bushings (2) into upper section of levelwind carriage.
c.
Vertical Roller Bushings. (FIGURE 4-24)
(1)
Position vertical roller (1).
(2)
Install bushings (2) into ends of vertical roller (1).
(3)
Repeat steps (1) and (2) for additional vertical roller.
d. Horizontal Roller Bushings. (FIGURE 4-23)
(1)
Position horizontal roller (1) on a flat surface.
(2)
Install bushings (2) into ends of roller.
(3)
Repeat steps (1) and (2) for additional horizontal roller.
e. Brake Band Lining. (FIGURE 4-22)
WARNING
ASBESTOS DUST HAZARD. To avoid a possible health hazard, be sure personnel wear protective
breathing devices (face mask) to avoid inhalation of asbestos dust particles when performing
maintenance on the stern anchor winch brake assembly.
(1)
Position brake bands for brake lining assembly.
(2)
Position brake linings (3) onto each brake band (1) with mounting screw holes aligned.
(3)
Secure each brake lining (3) to brake bands (1) with 25 brass screws (4) and hexagon self-locking nuts (2).
f.
Bearings. (FIGURE 4-21)
(1)
Use gear press to install bearings'(2) onto shaft (4).
(2)
Install machine keys (3) to each end of shaft.
4-46
|
||