Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-1
Install the two bottom antenna elements (13) by installing two nylon machine
g.
bolts through each side of the antenna elements and securing with two nylon
plain hexagon nuts (7) on each side of the antenna elements.
Connect the antenna vertical, attach to supporting pipe with two clamps (11).
h.
Holding antenna vertical, attach to supporting pipe with two clamps (11).
i.
Set clamps as far apart as possible, but not less than eight inches apart.
j.
Connect antenna lead-in wire to ships antenna wire at male/female connector
k.
(8) on bottom of antenna.
l.
Draw down neoprene weathershield (9) over the connection.
2-205
|
||