TM 55-1905-223-24-18-1
Install preformed packing (12).
a.
Install preformed packing (13), oil changer bottom (11) and three machine
b.
screws (10).
I n s t a l l seal (14).
c.
d.
Install gasket (21), inlet tube (22), and retaining ring (16).
Install gaskets (15) and (9).
e.
f.
Install hood cover (17) and four socket head screws (8).
Install preformed packing (18), inspection cover (19), and knurled screws
g.
(20).
Install thermometer (7).
h.
Install two preformed packings (23), sight glass (6), and housing (5).
i.
Install inlet pipe (4), funnel (3), and pipe nipple (2).
j.
Install needle valve (1).
k.
Replace purifier hood assembly, para. 2-20.
l.
Restore electrical power at panel P205, remove tags.
m.