Custom Search
 
  
 
TM 55-1905-223-24-18-1
FIGURE 2-81. Centrifugal Pump Unit (Fresh Water).
Install nipples (3) and (10) on pump (4).
a.
Position pump and motor (5) on foundation with mounting screw holes aligned.
b.
Secure motor to foundation with four hexhead capscrews (6), washers (7),
c.
lockwashers (8) and plain hex nuts (9).
Connect suction piping at union (11) to inlet side of pump.
d.
Connect discharge piping at union (2) located on top of pump.
e.
Replace or install new insulating material on unions at inlet and outlet
f.
sides of pump.
Open pump suction (12) and discharge (1) valves.
g.
Remove tags and connect electrical leads at junction box on motor.
h.
Run pump and check for proper operation and leaks.
i.
2-410


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business