TM 55-1905-223-24-18-1
Secure motor (2) to motor foot with four hexhead capscrews (12, 14).
d.
Connect suction piping at union (10) on front end of pump.
e.
Connect discharge piping at union (5) located on top of pump.
f.
Open pump suction (11) and discharge (4) valves.
g.
Remove tag and connect electrical leads at junction box (1) on motor.
h.
i.
Restore power to pump assembly.
Run pump to test rotation direction and check for leaks.
j.
2-414