Custom Search
 
  
 
TM 55-1905-223-24-18-1
(2) Engage circuit breaker on connector assembly.
(3) Secure circuit breaker to motor controller panel with mounting screws.
(4) Install switch cover over circuit breaker and secure cover with self
locking screw (2).
Remove tags.
(5) Connect electrical leads to circuit breaker (1).
e.
Terminal block (receptacle).
(1) Position terminal blocks (16) over mounting screw holes on motor
controller panel.
(2) Install two machine screws (19), lockwashers (18) and plain hex nuts (17)
and secure each terminal block to motor controller panel.
Remove tags.
(3) Connect electrical leads to terminal blocks (16).
f.
Fuseholder block.
(1) Position fuseholder blocks (8 and 9) over mounting screw holes on motor
controller panel.
(2) Install two machine screws (14), lockwashers (13) and plain hex nuts (12)
and secure each terminal block to motor controller panel.
(3) Connect electrical leads to fuseholder blocks. Remove tags.
( 4 ) Install fuse cartridges (10 and 11).
Transformer.
g.
(1) Position transformer (4) over mounting screw holes on motor controller
panel.
(2) Install four machine screws (7), lockwashers (6) and plain hex nuts (5)
and secure each terminal block to motor controller panel.
(3) Connect electrical leads to transformer. Remove tags.
h.
Auxiliary contact.
(1) Position motor starter (20) on a clean flat surface.
( 2 ) Attach auxiliary contact (24) to motor starter (20).
(3) Secure auxiliary contact with two attaching screws (23) to motor starter.
(4) Connect electrical leads to auxiliary contact.
(5) Repeat steps (2) through (4) to install auxiliary contact on opposite side
of motor starter.
2-755


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business