TM 55-1905-223-24-18-1
NOTE
The following procedure describes actions
required to complete installation of
Auxiliary Machinery Vent No. 1 Motor Control
center once the motor control center has
been placed into position in vessel.
Install motor control center (3) on deck mounting pad with associated
a.
hardware.
b.
Connect incoming wiring (1) to controller bus bars and terminals.
Install top cover panel (2) with associate hardware.
c.
Install removed motor controllers as specified in paragraphs 2-222 and 2-224.
d.
2-771


 