Custom Search
 
  
 
TM 55-1905-223-24-18-1
Place pressure gauges in position.
e.
Install screws (7) and nuts (2) on gauge panel (3) and tighten.
f.
Remove warning tags.
g.
Set the A.C.S.W. cooling pump circuit breaker to the ON position.
h.
Press the auxiliary seawater pump START button.
i.
Open isolation valve (8).
j.
Check for proper operation of gauges and leaks in system.
k.
2-1007


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business