TM 55-1905-223-24-18-2
d. Remove four screws (6).
e. Separate and position cover (5) and thermostat control leads (7) clear of opening to junction box (4).
f. Install input voltage line.
g. Connect fittings (3) on junction box.
h. Connect electrical wiring at junction box. Remove tags.
i. Install thermostat control circuit leads and cover.
j. Install four screws (6) and secure cover to junction box (4).
k. Open suction and discharge valves. Remove tags.
l. Restore power to lube oil purifier heater. Remove tags.
3-81