Tweet |
![]()
Custom Search
|
|
![]() |
||
![]() TM 55-1905-223-24-18-2
ASSEMBLY
a. Install bus bar (18).
b. Install shunt assembly (17).
c. Install fixed capacitors (15, 16).
d. Install panel (14).
e. Install capacitor bracket (33) and capacitor (32).
f. Install terminal studs (30, 31) voltage link (29), and terminal board (28).
g. Install transformer assembly (13).
h. Install alternating current motor (12).
i. Install fan blade (11) and fan housing (10).
j. Install mode switch (21) and handle (20).
k. Install water connector (26).
l. Install gas connector (27).
m. Install water solenoid valve (2, Figure 3-56).
n. Install gas solenoid valve (1).
o. Install terminal bus bar (25, Figure 3-55) and insulated terminal (24).
p. Install terminal cover assembly (23).
q. Install spring latch (22).
r. Install fastener cover (19).
s. Install panel (10).
t. Install panel (6) and cover (5).
u. Install panel (8) and access door (7).
v. Install gasket (4), dust and moisture seal protective cap (3), bushing (2), and top panel (1).
3-246
|
||
![]() |