Tweet |
Custom Search
|
|
|
|||||
|
|||||
TM 55-1905-223-24-18-2
am. Remove switch (65).
REPAIR
Repair at this level of maintenance is by replacement of temperature switch (18, Sheet 1), indicator light
(16), push switch (12), and switch (65, Sheet 5).
ASSEMBLY
a. Install switch (65).
b. Install seal (66).
c. Install dryer front panel (67).
d. Install sleeve bushing (73) and machine screw (74).
e. Install hold-down clip (64).
f. Install sleeve bushing (63) and machine screw (62).
g. Install hexagon head capscrew (68).
h. Install support rivet (72).
i. Install access door (71).
j. Install flat washer (69) and machine screw (70).
k. Install dry door catch (53, Sheet 4) and dryer door striker (52).
l. Install nonmetallic seal (61).
m. Install access door (48), speed nut (60), hinge (58), and machine screw (59).
n. Install outer door and inner door panel (50).
o. Install dryer door handle (49) and hexagon head capscrew (51).
p. Install pad (55).
q. Install machine screw (57), bracket support (54), and locknut (56).
r. Install top brace (45, Sheet 3).
s. Install resilient mounts (44).
t. Install cabinet top (41).
u. Install speed nut (47) and assembled washer screw (46).
v. Install ground wire (43) and hexagon head capscrew (42).
3-377
|
|||||