Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
3-172. Repair 120V Emergency Power Distribution. (Figure 3-157)
This task covers:
a. Repair
INITIAL SETUP
Tools
Equipment Condition
Tool kit, electrician's,
Emergency switchboard circuit breakers
OFF and tagged "Out of Service - Do
Not Operate." TM 55-1905-223-10.
Materials/Parts
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment change can result from
contact with live electrical circuits. Before beginning work on
this, or any other electrical equipment,, turn power and control
voltage circuit breakers OFF and tag "Out of Service - Do Not
Operate."
REPAIR
NOTE
Repair of 120V emergency power distribution is by replacement
of associated electrical cables (1 through 10).
a. Disconnect cable (1 through 10) from emergency switchboard and termination point.
b. Run new cable. Attach to power distribution panel and switchboard.
Change 1 3-564
|
||