TM 55-1905-223-24-18-2
REPAIR
Repair at this level of maintenance is by replacement of the pipe hangers (5).
REPLACEMENT
a. Position pipe hanger (5) on pipe and secure using bolts (1) and nuts (2).
b. Install upper half of pipe clamp (4).
c. Secure using bolts (3) and nuts (6).
3-696