Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-18-2
DISASSEMBLY
a. Using a cutting torch, remove pipe flanges (21, 22, 24, 26, 28, 30, 36).
b. Using a cutting torch, remove metallic pipes (20, 23, 25, 27, 29, 31, 37).
c. Remove plain hexagon nuts (32) and lockwashers (33).
d. Remove steel plate (34) and gasket material (35).
REPAIR
Repair at this level of maintenance is by replacement of worn or defective parts.
ASSEMBLY
a. Install gasket material (35) and steel plate (34).
b. Install lockwasher (33) and plain hexagon nuts (32).
c. Using a welding torch, install metallic pipes (37, 31, 29, 27, 25, 23, 20).
d. Using a welding torch, install pipe flanges (36, 30, 28, 26, 24, 22, 21).
REPLACEMENT
a. Install tank (18) on bulkhead.
b. Install lockwasher (14) and hexagon nut (13).
c. Install machine bolts (15, 10, 7, 4, 1) lockwashers (16, 11, 8, 5, 2) and
plain hexagon nuts (17, 12, 9, 6, 3).
d. Replace liquid quantity indicator, para. 2-292 .
e. Open fuel supply and fill valves, TM 55-1905-223-10.
3-745
|
||