Custom Search
 
  
 
TM 55-1905-223-24-18-2
4-16. Replace/Repair Frame Assembly.
This task covers:
a. Removal
b. Disassembly
c. Repair
d. Assembly
e. Replacement
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, general mechanic's,
Electrical power to lube oil purifier
turned OFF at P205 power/lighting
panel and tagged "Out of Service - Do
Materials/Parts
Not Operate."
Frame P/N 2125-1001-000
Rubber cushion P/N 0021-3017-750
Gasket P/N 0004-5447-740(3)
Gasket P/N 0018-4841-750
Gasket P/N 0007-2387-750
Gasket P/N 0004-2076-700
Preformed packing P/N 0007-2508-750
Sight glass P/N 0001-0040-820
Warning tag, Item 1, Appendix C
Porcelain cement/two-component
adhesive, Item 19, Appendix C
REMOVAL
a. Remove hood assembly as specified in paragraph 2-20 .
b. Remove pump connection assembly as specified in paragraph 2-18 .
c. Remove double gear pump assembly as specified in paragraph 2-19 .
d. Remove motor assembly as specified in paragraph 2-17 .
e. Remove bowl assembly as specified in paragraph 3-16 .
f. Remove horizontal gear assembly as specified in paragraph 3-18 .
g. Remove vertical gear assembly as specified in paragraph 3-17 .
DISASSEMBLY (Figure 4-5)
a. Gaskets.
(1) Remove three gaskets (1) from frame top.
4-16


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business