Custom Search
 
  
 
TM 55-1905-223-24-18-2
SECTION II MAINTENANCE ALLOCATION CHART
FOR PIPING SYSTEM
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
GROUP
COMPONENT/
MAINTENANCE
UNIT
INTERMED. DEPOT
TOOLS AND
NUMBER
ASSEMBLY
FUNCTION
C
O
F
H
D
EQUIPMENT
REMARKS
1819
PIPING SYSTEM
INSPECT
1.0
A
REPLACE
50.0
1-6
REPAIR
5.5
10.0
1-6
181901
PIPING,POTABLE WATER REPLACE
3.0
1,3-6
REPAIR
1.5
2.0
1,3-6
18190101 HEATER,HOT WATER
REPLACE
2.0 1,2,6
REPAIR
0.5
2.5
1,2,6
181902
PIPING,BILGE BALLAST
INSPECT
1.0
A
AND FIREMAIN
REPLACE
3.0
1,3,4
REPAIR
1.5
2.0
1,3,4
181903
PIPING,SEAWATER
COOLING
INSPECT
1.0
A
REPLACE
3.0
1,3,4
REPAIR
1.5
2.0
1,3,4
181904
PIPING,FRESH WATER
REPLACE
3.0
1,3,4
A
COOLING
REPAIR
1.5
2.0
1,3,4
181905
PIPING,COMPRESSED
AIR
REPLACE
3.0
1,3,4
A
SYSTEM
REPAIR
1.5
2.0
1,3,4
181906
PIPING,FIRE,WNQITOR
AND
REPLACE
3.0
1,3,4
A
WASHDOWN SYSTEM
REPAIR
1.5
2.0
1,3,4
181907
PIPING,LUBE OIL
REPLACE
3.0
1,3,4
A
TRANSFER/DIRTY OIL
REPAIR
1.5
2.0
1,3,4
DISCHARGE
181908
PIPING,HYDRAULIC OIL
REPLACE
3.0
1,3,4
A
REPAIR
1.5
2.0
1,3,4
181909
PIPING,OILY WATER
REPLACE
3.0
1,3,4
A
SEPARATOR
REPAIR
1.5
2.0
1,3,4
181910
PIPING,BILGE MANIFOLD REPLACE
3.0
1,3,4
A
UNIT ASSEMBLY
REPAIR
1.5
2.0
1,3,4
181911
PIPING,FUEL TRANSFER REPLACE
3.0
1,3,4
A
PUMP UNIT ASSEMBLY REPAIR
1.5
2.0
1,3,4
Change 1
B-83


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business