Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-2
This task covers: a. Disassembly, b. Repair, c. Assembly.
INITIAL SETUP
Tools
Equipment Condition
Deep well sockets, 1/2-inch drive
12 pt, 10 mm through 27 mm
TM 55-1905-223-10, Engine secured,
5120-01-113-8078
tagged "Out of Service, Do Not Operate."
Combination wrench set,
Refer to the following paragraphs in this
10 mm through 24 mm, metric
maintenance manual:
5120-01-046-4979
Gearbox drained (PMCS Item 9)
Strong back P/N 57864-850
External hardware removed (para. 2-14)
Hydraulic press P/N 200913
Fluid transmission cooler removed (para. 2-17).
Bearing puller P/N ST-1249
Double changeover filter removed (para. 2-18).
Materials/Parts
Control valve removed (para. 2-20)
Anti-friction bearing
Torsional coupling removed (para. 2-21)
P/N WAV850-P22,
External input/intermediate shafts
WAV850-P21, WAV850-P20
removed (para. 3-11)
Helical compression spring
Upper casing removed (para. 4-8)
P/N WAV850-G28
Input shaft removed (para. 4-8)
Solvent, Item 4, Appendix C
Intermediate shaft removed (para. 4-10).
Shop cloths, Item 6, Appendix C
Middle casing removed and output shaft
Warning tags, Item 12, Appendix C
removed (para. 4-12)
General Safety Instructions
Components are very heavy. Be sure to use
proper lifting equipment and exercise
care.
DISASSEMBLY
CAUTION
The output shaft coupling is heavy. Have an
additional soldier available to assist in removal.
(1) Remove cotter pin (23).
4-27
|
||