TM 55-1905-223-24-3
FIGURE 3-29. Gasket Stack-Up Thickness.
(d)
If you can not correct the injection timing by increasing or decreasing the thickness of the cam
follower housing gaskets, an offset camshaft key must be installed (paragraph 4-13).
(e)
After completing the injection timing check on cylinder No. 1, check the injection timing on
cylinders No. 3 and 5. Remove test equipment.
d. Install the injectors (paragraph 2-40).
e. Install the accessory drive assembly (paragraph 3-19).
f.
Install the fuel pump (paragraph 2-37).
g. Install the push rods.
h. Install the rocker lever housings (paragraph 2-39).
i.
Adjust the valves and injectors (paragraph 2-39).
j.
Install the rocker housing covers (paragraph 2-39).
k.
Remove tags, run the engine, and check for leaks and engine operation.
3-64
|
||