Tweet |
Custom Search
|
|
|
||
TM 55-1905-223-24-3
3-25. Replace/Repair Flywheel and Flywheel Housing Group.
This task covers:
a.
Removal
b.
Repair
c. Replacement
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's
Engine shut down and cooled below 120
F
rail and marine diesel engines,
(50 ) TM 55-1905-223-10.
C
Air supply secured (port).
Torque wrench kit P/N 3377216
Battery banks disconnected (starboard).
Multimeter 6625-01-139-2512
Generator assembly removed (paragraph
Combination wrench set,
3-13).
5120-01-046-4979
Air starter removed, port engine
Lifting fixture P/N 3822512
Lifting sling P/N 3375958
Electric starter removed, starboard
Crack detection kit P/N 3375432
engine (paragraph 2-25).
Dial indicator gauge P/N 3376050
Dial indicator attachment
P/N ST-1325
Dowel puller P/N ST-1134
Crankshaft oil seal driver
P/N ST-997
Materials/Parts
Wire brush, Item 42, Appendix C
Lubricating oil, Item 2, Appendix C
Marking chalk, white,
Item 30, Appendix C
Crocus cloth, fine, Item 26, Appendix C
Engine flywheel assembly
P/N 3023510
Rear crankshaft seal P/N 3006737
Gaskets P/N 3021735 and P/N 40662-A
T-handle studs
Metal cleaning solvent,
Item 6, Appendix C
Flywheel mounting guide studs, Item 49,
REMOVAL
a.
Remove the flywheel assembly as follows:
3-111
|
||