Custom Search
 
  
 
TM 55-1905-223-24-3
3-28. REMOVE/REPAIR SUBBASE GROUP.
This task covers:
a. Removal
b.
Repair
c.
Replacement
INITIAL SETUP:
Tools
Equipment Condition
Tool kit, general mechanic's rail
Generator removed (paragraph 3-13).
and marine diesel engines,
Engine removed (paragraph 3-13A).
Lifting fixture P/N 3822512
Lifting sling P/N 3375958
Materials/Parts
Resilient mounts P/N 3056517
REMOVAL
a. Attach the lifting fixture to the four lifting pad eyes (2, Figure 3-84).
b. Remove the nuts (6) and lift the subbase (3) clear of the resilient mounts (7). Remove the mounts.
c. Remove lifting fixture.
d. Remove four hexagon capscrews (5), lockwashers (4), and plain hexagon nuts (1) to remove each
lifting pad eye (2).
REPAIR
Repair to the subbase is by replacement of resilient mounts. Refer to the Removal and Replacement steps of
this procedure.
NOTE
The subbase is mounted to the six resilient mounts (7, Figure 3-84).
3-138


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business