(e)
If you can not correct the injection timing by increasing or decreasing the thickness of the
cam follower housing gaskets, an offset camshaft key must be installed (General Support
(GS) maintenance required).
(f)
After completing the injection timing check on cylinders No. 1, 3, and 5, remove the test
equipment.
(7)
Install accessory drive. Refer to paragraph 3-19.
(8)
Install the injectors (paragraph 2-34).
(9)
Install the fuel pump (paragraph 2-33).
(10)
Install the push rods.
(11)
Install the rocker lever housings (paragraph 3-16).
(12)
Adjust the valves and injectors (paragraph 2-34).
(13)
Install the rocker housing covers (paragraph 3-16).
(14)
Run the engine (TM 55-1905-223-10) and check for leaks and engine operation.
3-60
|
||