Custom Search
 
  
 
TM 55-1905-223-24-5
4-15. Repair Friction Clutch Power-Takeoff Assembly. (SP 214 Pl/with a djustable clutch.).
This task covers:
a. Disassembly
b. Repair
c. Assembly
INITIAL SETUP:
Tools
Equipment Condition
Tool kit, general mechanic's
rail and marine diesel engine,
Friction Clutch Assembly removed
Engine lifting fixture P/N 3822512
Combination wrench set,
5120-01-046-4979
Gear puller P/N 3375016
Searing puller P/N ST-1178
Torque wrench kit P/N 3377216
Materials/Parts
Internal gear P/N 5713
Annular ball bearing P/N M1985A
Wooden blocks, Item 7, Appendix C
NOTE
o It is necessary to remove the friction clutch
assembly from the engine first, then the clutch from
the clutch shaft in order to replace worn clutch
plates.
o The pilot roller bearing may be replaced without
removing the clutch from the clutch shaft.
Change 1
4-51


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business