Tweet |
Custom Search
|
|
|
||
TM 55-1905-242-14
0001 00
PREPARATION FOR STORAGE OR SHIPMENT
Detailed procedures for preparing the LCM-8 Mod 2 for storage or shipment are contained in TB 740-97-4, Preservation of
Vessels for Storage.
WARRANTY INFORMATION
Unit maintenance maintains records of the warranty status of equipment on the LCM-8 Mod 2. The warranty starts on the
date found in block 23 of DA Form 2408-9 (Equipment Control Record). Report all defects to your supervisor, who will
take appropriate action.
NOMENCLATURE CROSS-REFERENCE LIST
Common Name
Official Nomenclature
Alternating current transformer
Power transformer
Compass
Digital compass system (KVH MV103AC)
Data modem
SEATOR SEA 3000 Modem
Diesel generator
Generator assembly
Fire alarm system
Fire detection system
Fire monitor
Fire/waterway monitor
Fire pump
Ballast/fire pump
"Hand charging pump, propulsion engine starting"
Hand pump
"Hydraulic pump, steering"
Steering pump
Loudhailer
RAY 430 Loudhailer
"Nozzle, fire monitor"
Fire nozzle
Oily water collection and pumping system
Oily water collection system
Pressure set
Water pressure set
Radar
AN/SPX-69 R80 Radar
Ramp control valve
Ramp hoist control valve
Ramp hand pump
Ramp hoist hand pump
SSB radio
HF/SSB Radio telephone SEA330
VHF/FM radio
VHF-FM DSC 500A
Watch receiver
MF/HF DSC Watch reciever
Winch
Ramp winch
0001 00-2
|
||