Custom Search
 
  
 
TM 55-1905-242-14
0100 00
INSTALLATION
1.
Procure a new circuit breaker (2).
2.
Position the circuit breaker (2) in the panel (8) and secure it with the two screws (7).
3.
Install the ON/OFF indicator plate (6), flat washer (5), and nut (4) on the circuit breaker (2).
4.
Connect the wiring (1) to the rear of the circuit breaker (2) using the labels from step 3 of Removal as a guide and secure
it by tightening the four screws (3).
5.
Remove the lockouts and tagouts and check the operation of the affected circuit.
END OF WORK PACKAGE
0100100 00-3
0 00-3/4 blank


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business