Custom Search
 
  
 
TM 55-1905-242-14
0165 00
ASSEMBLY (continued)
5.
Slide the collars (21) onto the sight glass (23).
6.
Slide the sight glass (23) up into the upper valve (22) and then down into the lower valve (22). Secure the sight glass (23)
by tightening the collars (21).
7.
Install the rod (19).
INSTALLATION
1.
Position the expansion tank (9) in place on the mounting bracket (18) and secure it with the bracket strap (17), capscrews
(16), lockwashers (15), and hex nuts (14).
2.
Slide the hose (13) into place and secure it with the hose clamps (12).
3.
Install the hose (11) and secure it with the hose clamps (10).
4.
Wrap the male pipe threads with antiseizing sealant tape and install the elbow (8), pipe (7), elbow (6), and pipe (5).
5.
Wrap the male pipe threads with antiseizing sealant tape and install the swing check valve (4), pipe (3), and hose (2). Secure the hose
with the hose clamps (1).
6.
Refill the system with a mixture of antifreeze and fresh water suitable for the ambient temperature (refer to
TM 5-2815-231-14).
7.
Remove the lockouts and tagouts, start the engines, and bring them to operating temperature, ensuring that no leaks are
present.
8.
Secure the engines and recheck the engine coolant level.
END OF WORK PACKAGE
0165 00-4


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business