TM 55-1905-242-14
0191 00
INSTALLATION (continued)
c.
For proper alignment, clearance "Y" should be the same at points "V" and "W." Clearance "Z" should also be the
same at points "V" and "W." Clearance "Y" does not have to equal clearance "Z."
d.
If clearance "Y" or "Z" varies by more than 0.005 inch (0.13 mm) as measured at points "V" and "W," install shims
under the corner of the winch base until clearances are within acceptable tolerances when the winch is bolted
solidly to its mounting.
OIL LEVEL PLUG
Y
FINAL
DRIVE
W
ASSEMBLY
V
PRIMARY
DRIVE
ASSEMBLY
Z
VENT PLUG
VENT PORT (Q)
8.
Position one crewmember in the pilothouse to operate the winch and two crewmembers on the bow ramp to feed the
winch cable. The crewmembers on the bow ramp must don protective leather gloves.
9.
Install the bitter end of the winch cable into the winch drum (2) and secure it with the wedge (1).
10. Remove the lockouts and tagouts from the propulsion engines.
11. Place the ramp control in the UP position (winch in the cable) while one crewmember on the bow ramp keeps the winch
cable taut and the other crewmember ensures that the winch cable reels evenly onto the winch drum (2).
12. After taking up all of the slack in the winch cable, position the bow ramp as required.
13. Check the winch area to ensure that no leakage is present.
14. Dispose of used oil, hydraulic fluid, and contaminated materials in accordance with local regulations.
END OF WORK PACKAGE